How to dry-apply tuffjoint jointing mortar

How to dry-apply tuffjoint jointing mortar

tuffjoint is Steintec's dry-apply jointing mortar: pour it on, squeegee it in, mist it, clean off. Done properly it's the fastest way to joint a patio and it cures hard, permeable and weed-free. Done in a hurry it stains the surface or washes out of the joints, and both are avoidable. This is the method, straight from the Steintec method statement, with the bits we see people skip pointed out.

Before you start

  • Keep everyone off newly laid paving for at least 12 hours before jointing. You can joint the same day you lay, but only if you can do it without standing on the new surface.
  • Temperature between 2°C and 30°C. No jointing below 2°C, and guard against night frosts.
  • Clean and clear. Every bit of debris off the surface and out of the joints.
  • Check the forecast. Don't install in the rain, and if rain's due within 6 hours of finishing, have covers ready.
  • Dry or damp surface, not wet. tuffjoint is designed for dry paving but works on damp. If there's standing water, squeegee it off first. Damp mortar clumps and won't spread; dry mortar flows into the joints.
  • Right kit: a soft foam rubber squeegee, a Washboy bucket with rollers and sponge float, and a hose with a fine mist setting. Not a stiff broom, not a jet wash.
  • Optional: Steintec's Install Protect coating applied to the paving beforehand makes the clean-down easier. Let it dry fully before jointing.

Application

  1. Squeegee off any standing water. No water in the joints either; a leaf blower sorts that quickly.
  2. Pour tuffjoint straight from the tub onto the paving, dry.
  3. Draw it across the surface with the squeegee so it drops into the joints. Work diagonally at 45° to the joint lines; straight along them and the squeegee pulls the mortar back out.
  4. Squeegee the excess off the surface. Dry excess can go back in the tub. Anything that's got damp is scrap.
  5. Mist the whole area with water until it starts pooling on the joint surface. Fine mist only. Don't aim the hose into the joints and don't use a pressure washer; either washes the mortar straight out.
  6. Top up. The water pushes the mortar down into any voids, so joints often drop. Pour more mortar onto the low spots and repeat steps 3 to 5.

Cleaning off

Start the moment you've finished watering. Don't go for a brew first.

  1. Clean squeegee over the whole surface to lift the bulk of the residue.
  2. Final clean with the Washboy sponge float. On big areas, a powered sponge-belt cleaner (Pergo 880 or similar) does it faster.
  3. Keep the surface damp for as long as you can while the mortar sets.

No mortar left on the surface, anywhere. Once it cures on the face of a slab it's a job for resin remover and patience, and on textured stone it may never fully shift.

Where it goes wrong

  • Jointing straight along the lines. The 45° thing isn't fussiness; it's the difference between full joints and half-empty ones.
  • Too much water, too hard. Pooling on the surface is the signal to stop. A jet into the joint takes the mortar with it.
  • Leaving it for ten minutes before cleaning. The residue goes off fast. Clean as you go, in sections if the area's big.
  • Jointing onto wet paving. It clumps, it won't spread, it stains. Wait, or squeegee the water off.
  • Not topping up. The first pass rarely fills every joint. Walk it after watering and pour more where it's dropped.