Working out quantities: the sums we do at the counter

Measuring up an excavated patio area

Running out of material on a job costs you half a day and a trip to the yard. Over-ordering costs you money and a skip. Here's the arithmetic we use at the counter, so you can work it out on the back of a quote.

Start with the area

Measure the finished area in metres and multiply length by width. For an L-shape, split it into rectangles and add them. For anything curved, measure the longest and widest points and treat it as a rectangle; you'll over-order slightly, which is the right way round. Then add 10% for cuts and breakages on paving, 5% on aggregates.

Sub-base

Area × compacted depth × 1.25 (for compaction) gives you loose cubic metres. A bulk bag of MOT Type 1 is roughly 0.5m³ loose, or around 850kg.

  • At 100mm: one bulk bag per 10m²
  • At 150mm: one bulk bag per 7m²

30m² patio at 100mm: 3 bags, order 4.

Bedding sand

A 30 to 40mm bed of sharp sand and cement uses roughly 1 bulk bag of sharp sand per 12m². Add one 25kg bag of cement per 5 to 6 bags of sand for a 5:1 mix. For a 30m² patio: 3 bulk bags of sharp sand (order 3), and 15 or so bags of cement.

Paving

Most natural stone comes in project packs that cover a stated area; our Raj Green sandstone pack covers 15.3m². Porcelain is sold per slab or per pack, so divide your area by the slab area. A 600×600 slab is 0.36m²; 30m² needs 83 slabs, plus 10% is 92, so order 46 packs of two.

Jointing

Coverage depends heavily on joint width and slab size, which is why jointing compound bags always give a range. For 600×600 slabs at 10mm joints, a 15kg bag does roughly 12m². For small-format block paving or narrow-joint porcelain it'll go further; for random-pattern sandstone with wide joints, less. Work it out from the bag, then add one.

Block paving

Standard 200×100 blocks: 50 per square metre. Our brindle packs are 9.76m², so a 40m² driveway is 4.1 packs, which means 5. Kiln dried sand for the joints: one 25kg bag per 10m², so 4 bags.

Membrane

Area plus 10% for overlaps (150mm minimum at every join). A 2m × 50m roll is 100m²; one roll does most domestic jobs. Pegs at roughly 4 per square metre on the edges and overlaps.

Fencing

Run length ÷ 1.83 for panel count (round up), plus one more post than panels. One bag of Postmix per 100mm post hole as a rule of thumb; two if the ground's soft or the post is over 2.4m.

A worked example

30m² sandstone patio on firm ground, 100mm sub-base, 10mm joints:

  • MOT Type 1: 4 bulk bags
  • Sharp sand: 3 bulk bags
  • Cement: 15 bags
  • Sandstone: 2 project packs (30.6m², leaves 0.6m² plus whatever you break)
  • Jointing compound: 3 bags
  • Geotextile: 1 pack if the ground's soft

Every Terrefixia product page shows coverage per bag or pack. If the sums don't add up, ring the yard; we do this all day.